The Metallurgical Combine “Steel of the Party” in Elbasan was one of the most important industrial works in Albania, built in the 70s. The combination was built by Chinese engineers and specialists with the assistance of Albanian specialists. During the construction 2.5 million m3 of soils were rolled out, 830,000 m3 of concrete was cast, 146,000 m3 of prefabricated elements were prepared, 43,000 tons of metal constructions. There were built 520 objects, 47 km of internal railways, 22 km of motorways. There were about 12,000 workers in this giant.